So another day on ship. When we woke we were enroute to Freeport Texas. We went to the engine room to begin out days work. We began our day with our first drawing (sw cooling system). Afterwards we assisted in putting the insulation on the economizer (for one of the boilers). After lunch Chris and I split up. Chris went to work with the galley drains (which smells not wonderful). While I got to help assemble the piston. When they were on port in houston they switched out a cylinder with a spare in the main engine. So I was working with constructing the new spare. We finished the day with finishing our sw cooling system drawing. What a busy Christmas. I would say. However, they said real Christmas is after Panama. So I'm excited for post-panama Christmas, stars, and Asia
A breathtaking adventure of the young soon to be naval architects or marine engineers, Aaron Tam and Chris Herrel sail across the great seas. A grand journey where they will encounter the mysteries of naval architecture, marine engineering, and the world as they travel aboard the Stolt Sapphire.
Thursday, December 25, 2014
Work day 3 The Green Butterflies
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment